Original and inspired designs

Packaging and Transit

Packaging and Transit – Timeline
Global Economy: 3-5 days
Global Priority:    1-3 days
Note: If parts are to be sent to production for assembly, please communicate with us before declaring the value

Packaging and Transit – Safety Control

Box and carton packaging safety
Possible design damage control – controllable factors:
1. Double carton box with padded corners and foam filling
2. Manage clients’ imagination and expectation for damage control
3. Material alteration

Packaging and Transit – Damage Control

Possible design damage control – controllable factors:
1. Manage clients’ imagination and expectation with damage control in mind. Consider the bonding media added, and spacers
2. Design alteration – consider thickened or strengthening bars etc.

Uncontrollable factors:
1. Rough handling*
2. Custom inspection*
*Note: These are the uncontrollable factors, which cause more than 15% of the damage or delays that we encounter.

Video

×